Lucus Feroniae Footbridge

Preliminary, final and construction design, construction supervision. Country: Italy Year: 2013 MAIN CLIENT Soprintendenza Beni Culturali, Ambientali e Paesaggistici del Lazio Contract by EDIN s.r.l. Technical director Marcello Colasanti New footbridge overpass connecting the areas of the archaeological site lucus feroniae (sacred wood dedicated to Feronia, the Italic goddess of fertility of the fields and…

Routine Maintenance Facility of Turin Railway Shunting

FINAL DESIGN Civil Structures of the New Routine Maintenance Facility of Turin Railway Shunting Country: Italy Year: 2013 MAIN CLIENT Italferr s.p.a. Contract by EDIN s.r.l. Technical director Marcello Colasanti The new Routine Maintenance Facility of The Turin Railway Shunting (IMC) is part of the railway area overlooking the Lingotto building to the south of…

Messina Strait Bridge

Final Design of Terminal Structures. Country: Italy Year: 2011 MAIN CLIENT COWI A/S Contract by EDIN s.r.l. Technical director Marcello Colasanti The Messina Strait Bridge is a long-planned suspension bridge across the Strait of Messina, a narrow section of water between the eastern tip of Sicily and the southern tip of mainland Italy, specifically between…

Ponte della Scienza

Final design and work management. Country: Italy Year: 2010 MAIN CLIENT Municipality of Rome Contract by EDIN s.r.l. Technical director Marcello Colasanti The Ponte della Scienza (Bridge of Science) in the Ostiense district of Rome provides a link across the Tiber between the Ostiense and Marconi quarters of the capital. The bridge, with a total…