| Year | 2010 |
| Nation | Italy |
| Location | Rome |
| Client | Municipality of Rome |
| Contractor | EDIN S.r.l. |
| Technical director | Marcello Colasanti |
| Activity performed | Engineering services for the rehabilitation design of twin prestressed concrete bridges |
| Project value | 5 000 000 € |
| Key works | Structural assessment and rehabilitation design of two existing prestressed concrete bridges within the Rome metropolitan transport network |
| Analysis of deterioration mechanisms, load testing, and verification of residual bearing capacity | |
| Design of strengthening measures through external post-tensioning, replacement of bearings, and local deck repair | |
| Optimization of intervention strategies to minimize service interruptions and ensure long-term structural durability |