Skip to content
New Ring – Shqiponja You are here:
Home Project New Ring – Shqiponja
Year
2021
Nation
Albania
Client
Municipality of Tirana
Activity performed
Preliminary and detailed design
Project value
18 000 000 €
Key works
Level 1: Dedicated to the new Tirana Ring Road
Levels 2 & 3: Connect to Tirana–Durres Motorway (both directions)
Subsurface Construction: Designed to relocate heavy traffic infrastructure underground
Urban Integration: Infrastructure minimized at surface level to improve city aesthetics
Traffic Improvement: Enhances flow into/out of the capital